Editorial Type:
Article Category: Research Article
 | 
Online Publication Date: 21 Sept 2006

Cost Estimation of Solar Simulation Facilities in Europe

and
Page Range: 33 – 35
DOI: 10.17764/jiet.1.29.6.m8m2872653608536
Save
Download PDF

In view of eventual future investments in the field of space simulation facilities, the paper presents a parametric model, which provides ROM (Rough Order Magnitude) cost estimates for solar simulation facilities, with a beam diameter of up to 6m (19.7 ft). The model is based on cost figures of existing European test facilities and shows cost to be proportional to beam size.

  • Download PDF